Well & Septic Permits

Wells

A Health Permit for a well is necessary before drilling begins for a new private or public well. It is also necessary before modifying an existing well for any new construction, or for any addition or alteration of an existing structure not served by a public water system. After a well is drilled, the water must be tested and the results forwarded to the Health Department.

Septic

A Sewage Disposal Permit from the Health Department is required before a septic system is installed for a new structure, and before modification of an existing sewage disposal system.

Well or Septic System Permits