View All Posts

Apr 26

Design Continues for the Westwind Drive Project

Posted on April 26, 2021 at 10:31 AM by Heidi Kellum

The Westwind Drive project will connect Loudoun County Parkway and Old Ox Road and provide a link between Loudoun County’s two Metrorail Silver Line stations. Loudoun County has completed survey work and utility designation along Westwind Drive from State Street to Ladbrook Drive. The design team is now developing the conceptional roadway design elements and alternatives. 

The project begins at the intersection of Westwind Drive and Loudoun County Parkway (Route 607) and extends south approximately 6,300 feet to the intersection of Ladbrook Drive and Old Ox Road (Route 606). This project will directly link the roadways between two Metrorail Silver Line stations, Loudoun Gateway Station and Ashburn Station, by connecting Loudoun County Parkway and Old Ox Road.  This four-lane divided urban collector road will include construction of a new section of Westwind Drive from State Street to Ladbrook Drive in addition to other improvements along existing sections of Westwind Drive and Ladbrook Drive within the project limits. The project includes a new bridge over Broad Run. The project will also provide a sidewalk and shared use path that will extend for the full length of the project.

For more information on the Westwind Drive project, visit the project page.