Bid Number: RFQ 443782
Bid Title: Dulles South Recreation Center Phase 5 Pool Filter Upgrades, RFQ 443782
Category: Procurement
Status: Awarded
Additional Status Information: Notice of Award issued on May 4, 2022.
Bid Recipient: Hammerhead Construction

Description:

Due to restrictions surrounding the COVID-19 pandemic, public access to County facilities is extremely limited. The mailing of bids is preferred. However, if a bid is hand delivered, it will be received in the lobby of 1 Harrison Street, SE, Leesburg, VA 20175 ONLY in the Drop Box labeled: Procurement Bids and Proposals between the hours of 8:30 a.m. and 5:00 p.m.

ALL HAND DELIVERED BIDS MUST BE SUBMITTED AT THIS LOCATION PRIOR TO 4:00 P.M. on the Acceptance Date of the bid in order to be considered. Bids will not be accepted at any other building locations or after 4:00 P.M. Bids will be opened and announced by the Procurement Division staff via audio/video teleconference at 4:30 p.m. (Atomic time) on the Acceptance Date. To participate in the audio portion of the opening, please dial the number provided in the Instruction to Bidders and follow the prompts as designated. You may also witness the announcement of received bids as they are opened using GoToMeeting with the instructions included in the Instructions to Bidders

Please contact the Contracting Officer or Assistant Purchasing Agent designated on the front cover of the solicitation with any questions regarding this process. Bidders are strongly encouraged to check the County’s website routinely for updates.

The Intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (County) to obtain the services of a qualified General Contractor to replace the pool filtration system at the Dulles South Recreation Center Competition Pool, located at 24950 Riding Center Drive, South Riding, VA 20152.

The Dulles South Recreation Center Competition Pool was built in 2018, but the existing mechanical system does not effectivity remove chloramines from the pool environment. The aim of this work is to correct this deficiency. The scope of this project is to provide an updated pool water filtration system which will include demolition of existing filter system and associated network of piping, installation of new filter tanks and piping with an exterior enclosed structure.

The facility will remain in full operation during all demolition work and new work for this project. The facility as well as the Competition Pool will remain open to public at all times of normal operation for the duration of the work. Some staff parking must be accessible for the public to this building throughout construction. All construction access and construction staging will be from the rear of the facility. Some work may need to be performed outside of normal operation hours for certain parts of the work to ensure no disruption to the normal operation of the pool or the facility. A scheduled shut down will be necessary for new work connections to existing, this shall not exceed two (2) weeks.

Protection from all debris from entering the pool will be the sole responsibility of the contractor. If debris enters the pool, the contractor will cover all expense to drain and clean the pool in addition to a $1,000.00 for each day the pool is not available to the public as compensation to the County for lost revenue.

Testing Adjusting Balancing (TAB) and the Commissioning Agent will be hired directly by The County.

Project Timeline. The Contract Time is one-hundred-twenty (120) calendar days from Notice to Proceed to Substantial Completion. Notice to Proceed (NTP) will not be given until all materials and equipment are delivered and inspected by the County or their representative. All material and equipment submittals required by the specifications shall be submitted to the County no later than thirty (30) calendar days from the date of contract execution and approved by the County no later than sixty (60) calendar days from the date of contract execution.

Project Milestones:

• Substantial Completion of work shall not be given until after the filtration system has been function tested.

• Final Completion and the completion of punch list items; ten (10) calendar days after Substantial Completion.

The Contractor shall be responsible for all surveying to ensure the project is installed per the Plans and Specifications contained in Attachment 3. Any deviations from the Contract Documents shall be specifically requested via Request for Information (RFI) submitted to the Architect/Engineer of Record. All deviations shall be noted in the Contractor’s “Record Set” of Construction Documents. Upon completion of the Project, two (2) hard-copy sets, and one (1) digital copy of “Record Set” Construction Documents shall be provided to the County.

Lastly, the County will require the Contractor awarded this Project to use e-Builder Construction Program Management Software. The County will purchase two (2) licenses for the Contractor’s use and will provide training for the Contractor to ensure proficiency as recommended by e-Builder. The license and training will be provided to the Contractor at no cost and prior to the issuance of Notice to Proceed. Further training due to a lack of proficiency will be the responsibility of the Contractor.

The e-Builder Construction Program Management Software will be utilized for all Project management documentation and correspondence, including but not limited to: RFI’s, submittals, meeting minutes, pay applications, proposed change orders/change orders, close-out documentation, etc. Contact e-Builder for further information at www.e-builder.net or 1-800-580-9322.

Mandatory Pre-Bid Conferences:

Two (2) Mandatory Pre-Bid Conferences for clarification of any questions regarding the plans and specifications will be held at the Dulles South Recreation Center located at 24950 Riding Center Drive, South Riding, VA 20152. The first Mandatory Pre-Bid Conference will be held on November 4, 2021, at 1:00 PM and the second on November 5, 2021, at 1:00 PM.

Addenda:

Addendum #1 Changes and/or Additions issued on November 10, 2021.

Addendum #2 Changes and/or Additions issued on November 15, 2021.

Addendum #3 Changes and/or Additions issued on December 3, 2021.

Publication Date/Time:
10/26/2021 11:00 AM
Publication Information:
Invitation for Bid
Closing Date/Time:
12/14/2021 4:00 PM
Bid Opening Information:
See Related Documents
Addendum Date/Time:
Addendum #3 issued on December 3, 2021.
Pre-bid Meeting:
November 4, 2021 @ 1:00 PM
Contact Person:
Farah Navder
Please see the attached document RFQ 443782 for additional contact information.
Download Available:
See Related Documents
Business Hours:
8:30 AM to 5:00 PM
Miscellaneous:
Addendum #3 Changes and/or Additions issued on December 3, 2021.