Posted on May 7, 2024 at 4:28 PM by Heidi Kellum
Between now and the end of October 2021, Loudoun County will be periodically closing a lane along James Monroe Highway (Route 15) between Battlefield Parkway and Montresor Road for the purpose of soils testing associated with the planned widening of the roadway to a four-lane, median divided highway. Motorists will be alerted to alternating one-lane traffic through the work site by signage along Route 15.
Dates and times of upcoming closures will be posted prior to each planned lane closure at loudoun.gov/route15northwidening.
Drivers should expect delays and use extra caution when traveling through this area and follow all directions from the posted signs and road crews.
Note: This information was originally posted on August 23, 2021, on the Route 15 North Safety Improvements blog.