View All Posts

Dec 13

New Traffic Pattern for Belmont Ridge Road Begins December 13

Posted on December 13, 2023 at 9:04 AM by Heidi Kellum

On or about December 13, 2023, weather permitting, traffic in the northbound and southbound lanes of Belmont Ridge Road will be switched onto new roadway alignments between Croson Lane and Truro Parish Drive. Lanes will continue to be a single lane in each direction but will shift as more of the subsurface work is completed and more of the travel lanes are built to their final configuration.  

Drivers should use extra caution when traveling through this area on these dates and follow all directions from the posted signs and road crews who will use brief traffic stoppages when shifting traffic to new lane alignments. 

About the Project

This project reconstructs and widens Belmont Ridge Road between Truro Parish Drive and Croson Lane from the existing two-lane rural road to a modern four-lane, median-divided, suburban roadway, with shared-use paths for pedestrians and bicyclists on each side. Project benefits include alleviating traffic in the corridor, providing active transportation solutions, and connecting commuters to major activity and employment centers.

Funding for this regionally significant project is from Loudoun County, NVTA and the state’s Revenue Sharing Program administered by VDOT-LAP. Construction is expected to be completed by summer 2024.

More information, including a link to sign up for updates on the project, can be found at loudoun.gov/belmontridgeimprovements.